As a consequence, we had to make some small changes to the design of the front stairs and concrete wall, though I think the changes are improvements. More unfortunately, the city required us to get a soils test of the property and a geotechnical review from an expert certifying that our plans would likely not cause a landslide. While our geotechnical firm PanGeo is great and well-priced, it was a several thousand dollar expense that we had hoped to avoid. The city is also requiring us to contract PanGeo to monitor the construction, which is an additional cost.
Today, our GC and the city of Seattle had a required "Pre-Construction" meeting at the site, to go over various requirements imposed by the city inspectors. Because our building is near the height limits, they will require a surveyor to verify that we don't exceed our allowed height (yay, more costs). They also want us to re-submit a stormwater drainage plan, since we have postponed the green roof due to cost. Clearly they're not looking to make our lives easy. I'll conclude the post with one bonus image: the first sign of activity at our site. Our GC built a silt fence, as required by the city prior to the pre-construction meeting, which helps to control erosion and sediment caused by construction activity. On Monday they'll start digging!


VERY exciting! LET THE FUN BEGIN! Good luck guys.
ReplyDeleteGreat news!! Hope you can keep the unexpected inspections/surveys and associated costs down from here on :-)
ReplyDeleteGood Luck!!